The Rapidmix 400CW mobile continuous mixing plant was chosen by a joint venture for a major dual carriageway project in the UK to support efficient and continuous concrete production.
Introduction
A partnership between SACYR, Willis Bros Ltd, and Somague took on a significant road construction project involving a dual carriageway. To meet the demands of this large-scale job, they selected Rapidmix’s 400CW mobile continuous mixing plant.
The Problem
The project required a reliable and mobile concrete mixing solution capable of producing consistent material in high volumes to keep construction moving without delays.
What Was Carried Out
The Rapidmix 400CW was deployed on site, offering fully weighed, continuous mixing with flexibility and fast setup. Its mobile design allowed the team to manage mixes efficiently while keeping up with the project’s pace.
Results
The plant delivered a steady supply of concrete suitable for the project’s needs, improving overall productivity and helping maintain quality on a complex infrastructure scheme.
Closing Note
Using the Rapidmix 400CW proved to be a practical choice for a demanding roadworks project, combining mobility with consistent, controlled mixing.
